Cost of cement clinker with and without CO2 capture (CEMCAP)

The cost of making a tonne of clinker, the main ingredient of cement, in one modelled European cement plant without capturing its CO2 (62.6 euros) and with each of six capture technologies (93.0 to 120.0 euros), all on the same prices, as the CEMCAP project published it.

Latest value

62.6€/t clinker

A modelled European reference cement plant, 2014. Version Energies 12(3), 542 (2019).

As published

“Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3”

Comparison of technologies for CO2 capture from cement production, part 2, cost analysis (CEMCAP), Table 6, p. 10. Checked word for word against the stored copy of the document every time the data is rebuilt.

Every value

Cost of cement clinker with and without CO2 capture (CEMCAP), every published value
PlantPeriodValue (€/t clinker)Status
Reference plant, no CO2 captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3"201462.6final
With MEA absorption captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3"2014107.4final
With oxyfuel captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3"201493.0final
With chilled ammonia process (CAP) captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3"2014104.9final
With membrane-assisted CO2 liquefaction (MAL) captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3"2014120.0final
With calcium looping capture, tail-endTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3"2014105.8final
With calcium looping capture, integratedTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3"2014110.3final

Where it comes from

Version
Energies 12(3), 542 (2019)
Fetched
2026-10-08 (by a person), 2,108,286 bytes
Fingerprint
sha256 50f05980ed4f097af1655f3a9160d32c188e11558188f55dfca2a1295b24b94d
Copies
No Wayback copy recorded yet.Our copy of the exact file
Cite the producer
Gardarsdottir, S.O.; De Lena, E.; Romano, M.; Roussanaly, S.; Voldsund, M.; Pérez-Calvo, J.-F.; Berstad, D.; Fu, C.; Anantharaman, R.; Sutter, D.; Gazzani, M.; Mazzotti, M.; Cinti, G. Comparison of Technologies for CO2 Capture from Cement Production—Part 2: Cost Analysis. Energies 2019, 12, 542. https://doi.org/10.3390/en12030542

What was done to it

  1. Read the text of the PDF (sha256 50f05980ed4f…). Found each of the 1 quoted statement(s) word for word on PDF page(s) 11, and the 4 context sentence(s) the scope relies on, before publishing.

    Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs 50f05980ed4f…

  2. Published each number exactly as printed, with its statement in the value's note. A range 'A-B%' is published as its low end A and high end B (dimension 'bound'); nothing was computed, rounded or combined with any other source.

    Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs 50f05980ed4f…

  3. Table 6's column order (Ref. Cement Plant, MEA, Oxyfuel, CAP, MAL, CaL-Tail-End, CaL-Integrated) was checked in the page text, and the row's numbers had to be exactly the seven values in that order.

    Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs 50f05980ed4f…

What it covers

Geography
A modelled European reference cement plant
Basis
One modelled best-available-technology European cement plant (3,000 tonnes of clinker a day, defined by ECRA), without CO2 capture and with each of six capture technologies, on one set of prices: coal 3 euros per gigajoule, electricity 58.1 euros per megawatt-hour, 8% discount rate, 91.3% capacity factor, all costs in 2014 euros, no carbon tax. The reference plant's direct cost is based on IEAGHG estimates. Capture covers most but not all of the plant's emissions. The period is the price base year (2014); the article was published in 2019.
Unit
euros (2014) per tonne of clinker (€/t clinker)