Cost of cement clinker with and without CO2 capture (CEMCAP)
The cost of making a tonne of clinker, the main ingredient of cement, in one modelled European cement plant without capturing its CO2 (62.6 euros) and with each of six capture technologies (93.0 to 120.0 euros), all on the same prices, as the CEMCAP project published it.
Latest value
62.6€/t clinker
A modelled European reference cement plant, 2014. Version Energies 12(3), 542 (2019).
As published
“Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3”
Comparison of technologies for CO2 capture from cement production, part 2, cost analysis (CEMCAP), Table 6, p. 10. Checked word for word against the stored copy of the document every time the data is rebuilt.
Every value
| Plant | Period | Value (€/t clinker) | Status |
|---|---|---|---|
| Reference plant, no CO2 captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3" | 2014 | 62.6 | final |
| With MEA absorption captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3" | 2014 | 107.4 | final |
| With oxyfuel captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3" | 2014 | 93.0 | final |
| With chilled ammonia process (CAP) captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3" | 2014 | 104.9 | final |
| With membrane-assisted CO2 liquefaction (MAL) captureTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3" | 2014 | 120.0 | final |
| With calcium looping capture, tail-endTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3" | 2014 | 105.8 | final |
| With calcium looping capture, integratedTable 6, p. 10: "Cost of clinker (€/tclk) 62.6 107.4 93.0 104.9 120.0 105.8 110.3" | 2014 | 110.3 | final |
Where it comes from
- Producer
- Gardarsdottir, De Lena, Romano, Roussanaly, Voldsund, Pérez-Calvo, Berstad, Fu, Anantharaman, Sutter, Gazzani, Mazzotti and Cinti (SINTEF, Politecnico di Milano, ETH Zurich, Italcementi; the CEMCAP project); published in Energies (MDPI) · Comparison of technologies for CO2 capture from cement production, part 2, cost analysis (CEMCAP)
- Version
- Energies 12(3), 542 (2019)
- Fetched
- 2026-10-08 (by a person), 2,108,286 bytes
- Fingerprint
- sha256 50f05980ed4f097af1655f3a9160d32c188e11558188f55dfca2a1295b24b94d
- Copies
- No Wayback copy recorded yet.Our copy of the exact file
- Cite the producer
- Gardarsdottir, S.O.; De Lena, E.; Romano, M.; Roussanaly, S.; Voldsund, M.; Pérez-Calvo, J.-F.; Berstad, D.; Fu, C.; Anantharaman, R.; Sutter, D.; Gazzani, M.; Mazzotti, M.; Cinti, G. Comparison of Technologies for CO2 Capture from Cement Production—Part 2: Cost Analysis. Energies 2019, 12, 542. https://doi.org/10.3390/en12030542
What was done to it
Read the text of the PDF (sha256 50f05980ed4f…). Found each of the 1 quoted statement(s) word for word on PDF page(s) 11, and the 4 context sentence(s) the scope relies on, before publishing.
Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs 50f05980ed4f…
Published each number exactly as printed, with its statement in the value's note. A range 'A-B%' is published as its low end A and high end B (dimension 'bound'); nothing was computed, rounded or combined with any other source.
Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs 50f05980ed4f…
Table 6's column order (Ref. Cement Plant, MEA, Oxyfuel, CAP, MAL, CaL-Tail-End, CaL-Integrated) was checked in the page text, and the row's numbers had to be exactly the seven values in that order.
Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs 50f05980ed4f…
What it covers
- Geography
- A modelled European reference cement plant
- Basis
- One modelled best-available-technology European cement plant (3,000 tonnes of clinker a day, defined by ECRA), without CO2 capture and with each of six capture technologies, on one set of prices: coal 3 euros per gigajoule, electricity 58.1 euros per megawatt-hour, 8% discount rate, 91.3% capacity factor, all costs in 2014 euros, no carbon tax. The reference plant's direct cost is based on IEAGHG estimates. Capture covers most but not all of the plant's emissions. The period is the price base year (2014); the article was published in 2019.
- Unit
- euros (2014) per tonne of clinker (€/t clinker)