Skip to content
Environment Dashboard

Data

Extra cost of near-zero emissions cement in 2035, per tonne (IEA)

How much more the IEA expects it to cost to produce a tonne of near-zero emissions cement (a dry kiln with carbon capture and storage) than a tonne of conventional cement in 2035 under today's policies, without policy support: USD 50 to 175 per tonne, depending on the region.

Latest value

50USD/t cement

World (range across regions), 2035 (projection). Version Energy Technology Perspectives 2026 (IEA, March 2026; revised April and July 2026).

As published

“Near-zero emissions cement remains significantly more expensive, and in 2035 is still 75-150% more costly (USD 50-175 per tonne) in the STEPS, in the absence of policy support and significant scale-up.”

Energy Technology Perspectives 2026, Chapter 3, near-zero emissions cement dashboard, p. 141. Checked word for word against the stored copy of the document every time the data is rebuilt.

Every value

Extra cost of near-zero emissions cement in 2035, per tonne (IEA), every published value
End of the stated rangePeriodValue (USD/t cement)Status
Low endChapter 3, near-zero emissions cement dashboard, p. 141: "Near-zero emissions cement remains significantly more expensive, and in 2035 is still 75-150% more costly (USD 50-175 per tonne) in the STEPS, in the absence of policy support and significant scale-up."203550projection
High endChapter 3, near-zero emissions cement dashboard, p. 141: "Near-zero emissions cement remains significantly more expensive, and in 2035 is still 75-150% more costly (USD 50-175 per tonne) in the STEPS, in the absence of policy support and significant scale-up."2035175projection

Where it comes from

Producer
International Energy Agency · Energy Technology Perspectives 2026
Version
Energy Technology Perspectives 2026 (IEA, March 2026; revised April and July 2026)
Fetched
2026-10-08 (automatically), 33,223,886 bytes
Fingerprint
sha256 c4880aa007fcb05e771e75c21ec48ad8038e98570a0d4ab554440d14232c095bETag 0x8DED777A5D3C271 · Last-Modified Wed, 01 Jul 2026 13:50:01 GMT
Copies
No Wayback copy recorded yet.
Cite the producer
IEA 2026; Energy Technology Perspectives 2026, https://www.iea.org/reports/energy-technology-perspectives-2026, License: CC BY 4.0

What was done to it

  1. Read the text of the PDF (sha256 c4880aa007fc…). Found each of the 1 quoted statement(s) word for word on PDF page(s) 141, and the 2 context sentence(s) the scope relies on, before publishing.

    Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs c4880aa007fc…

  2. Published each number exactly as printed, with its statement in the value's note. A range 'A-B%' is published as its low end A and high end B (dimension 'bound'); nothing was computed, rounded or combined with any other source.

    Code: pipeline/src/envdash/transforms/action/green_premium.py · code sha256 c2e591e4a0510a3d… · inputs c4880aa007fc…

What it covers

Geography
World (range across regions)
Basis
Levelised cost of producing cement in 2035 in the IEA's Stated Policies Scenario (STEPS): dry kiln with carbon capture and storage, compared with a dry kiln, region by region; the range runs from lower- to higher-cost regions. Excludes explicit policy support such as carbon pricing or subsidies (method note, p. 163). Projection. Real 2024 US dollars at market exchange rates (the report's convention, p. 32).
Unit
US dollars (2024) per tonne of cement (USD/t cement)