Cost of electricity from new US power plants coming online in 2031 (EIA)

What it would cost, per megawatt-hour, to build and run a new power plant in the United States that starts operating in 2031, by type of plant, as projected by the US Energy Information Administration: solar, wind, nuclear, geothermal and hydro beside natural gas plants with and without carbon capture, and batteries. Shown before and after US tax credits. Plants of different types run for different shares of the year and play different roles on the grid, so EIA warns that these costs alone do not say which plant is the better choice.

Latest value

77.46USD/MWh

United States (25 electricity supply regions), 2031 (projection). Version AEO2026 (April 2026).

Cost of electricity from new US power plants coming online in 2031 (EIA) (US dollars (2025) per megawatt-hour)

36 values from 2031 to 2031. Lines: Simple average of the 25 US supply regions, Before tax credits (total system cost), Advanced nuclear, Simple average of the 25 US supply regions, Including tax credits (levelised tax credit and 45Q captured-carbon credit), Advanced nuclear, Average weighted by new capacity in 2031, Including tax credits (levelised tax credit and 45Q captured-carbon credit), Advanced nuclear, Simple average of the 25 US supply regions, Before tax credits (total system cost), Biomass, Simple average of the 25 US supply regions, Including tax credits (levelised tax credit and 45Q captured-carbon credit), Biomass. The shaded band is the uncertainty range the producer gives.
Show as a table
Cost of electricity from new US power plants coming online in 2031 (EIA), every value
PeriodPlant typeTax creditsAverage across regionsValue (USD/MWh)RangeStatus
2031Advanced nuclearBefore tax credits (total system cost)Simple average of the 25 US supply regions110.87104.34 to 122.65projection
2031Advanced nuclearIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions87.8181.29 to 99.59projection
2031Advanced nuclearIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 2031none (EIA marks it NB (not built): no new capacity of this type is projected to come online in 2031, so there is no capacity-weighted average.)projection
2031BiomassBefore tax credits (total system cost)Simple average of the 25 US supply regions107.6090.10 to 179.09projection
2031BiomassIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions84.5467.04 to 156.03projection
2031BiomassIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 2031none (EIA marks it NB (not built): no new capacity of this type is projected to come online in 2031, so there is no capacity-weighted average.)projection
2031Natural gas combined-cycleBefore tax credits (total system cost)Simple average of the 25 US supply regions77.4666.04 to 96.00projection
2031Natural gas combined-cycleIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions77.4666.04 to 96.00projection
2031Natural gas combined-cycleIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 203177.87projection
2031Natural gas combined-cycle with carbon capture and sequestration (CCS)Before tax credits (total system cost)Simple average of the 25 US supply regions77.1966.65 to 95.62projection
2031Natural gas combined-cycle with carbon capture and sequestration (CCS)Including tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions58.4748.05 to 77.12projection
2031Natural gas combined-cycle with carbon capture and sequestration (CCS)Including tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 203148.05projection
2031GeothermalBefore tax credits (total system cost)Simple average of the 25 US supply regions48.6944.17 to 52.61projection
2031GeothermalIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions40.3837.13 to 44.09projection
2031GeothermalIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 203140.44projection
2031Offshore windBefore tax credits (total system cost)Simple average of the 25 US supply regions118.79107.35 to 131.41projection
2031Offshore windIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions118.79107.35 to 131.41projection
2031Offshore windIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 2031none (EIA marks it NB (not built): no new capacity of this type is projected to come online in 2031, so there is no capacity-weighted average.)projection
2031HydroelectricBefore tax credits (total system cost)Simple average of the 25 US supply regions82.0870.23 to 96.43projection
2031HydroelectricIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions64.7755.33 to 74.71projection
2031HydroelectricIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 203158.64projection
2031Solar photovoltaic with a four-hour battery (hybrid)Before tax credits (total system cost)Simple average of the 25 US supply regions96.3368.21 to 135.42projection
2031Solar photovoltaic with a four-hour battery (hybrid)Including tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions94.2066.74 to 132.47projection
2031Solar photovoltaic with a four-hour battery (hybrid)Including tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 2031none (EIA marks it NB (not built): no new capacity of this type is projected to come online in 2031, so there is no capacity-weighted average.)projection
2031Solar photovoltaic, standaloneBefore tax credits (total system cost)Simple average of the 25 US supply regions58.3340.95 to 82.25projection
2031Solar photovoltaic, standaloneIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions58.3340.95 to 82.25projection
2031Solar photovoltaic, standaloneIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 203148.76projection
2031Onshore windBefore tax credits (total system cost)Simple average of the 25 US supply regions56.7539.62 to 110.97projection
2031Onshore windIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions56.7539.62 to 110.97projection
2031Onshore windIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 203146.71projection
2031Natural gas combustion turbineBefore tax credits (total system cost)Simple average of the 25 US supply regions172.57152.29 to 209.01projection
2031Natural gas combustion turbineIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions172.57152.29 to 209.01projection
2031Natural gas combustion turbineIncluding tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 2031168.10projection
2031Battery storage (levelised cost of storage)Before tax credits (total system cost)Simple average of the 25 US supply regions190.45180.88 to 211.22projection
2031Battery storage (levelised cost of storage)Including tax credits (levelised tax credit and 45Q captured-carbon credit)Simple average of the 25 US supply regions152.61144.06 to 174.56projection
2031Battery storage (levelised cost of storage)Including tax credits (levelised tax credit and 45Q captured-carbon credit)Average weighted by new capacity in 2031none (EIA marks it NB (not built): no new capacity of this type is projected to come online in 2031, so there is no capacity-weighted average.)projection
Source: U.S. Energy Information Administration (Apr 2026). Public domain (work of the US federal government).

Notes on individual values

  • EIA models this plant type at a capacity factor of 90%.
  • EIA models this plant type at a capacity factor of 83%.
  • EIA models this plant type at a capacity factor of 40%.
  • EIA models this plant type at a capacity factor of 87%.
  • EIA models this plant type at a capacity factor of 43%.
  • EIA models this plant type at a capacity factor of 56%.
  • EIA models this plant type at a capacity factor of 27%.
  • EIA models this plant type at a capacity factor of 38%.
  • EIA models this plant type at a capacity factor of 10%.

Where it comes from

Producer
U.S. Energy Information Administration · Levelized Costs of New Generation Resources in the Annual Energy Outlook 2026
Version
AEO2026 (April 2026)
Fetched
2026-10-08 (automatically), 675,530 bytes
Fingerprint
sha256 e371002d02821ef0260773b667e9791c14744dcc4801ee22dbed5be2046a3e10ETag "032fcdc1dc1dc1:0" · Last-Modified Tue, 31 Mar 2026 14:51:32 GMT
Copies
No Wayback copy recorded yet.Our copy of the exact file
Cite the producer
Source: U.S. Energy Information Administration (Apr 2026).
Producer
U.S. Energy Information Administration · Levelized Costs of New Generation Resources in the Annual Energy Outlook 2026
Version
AEO2026 (April 2026)
Fetched
2026-10-08 (automatically), 485,982 bytes
Fingerprint
sha256 8c11a13bed5b65248f59387e1fff7df24f8abd2480365b3ba7e54ab2c21981adETag "076b5d91ec1dc1:0" · Last-Modified Tue, 31 Mar 2026 14:58:36 GMT
Copies
No Wayback copy recorded yet.Our copy of the exact file
Cite the producer
Source: U.S. Energy Information Administration (Apr 2026).

What was done to it

  1. Read sheets 'lcoe-components' and 'lcoe-regional' of LCOE-LCOS-LACE_figures.xlsx (sha256 e371002d0282…), after checking that their titles name AEO2026, online year 2031 and 2025 dollars, and that the plant types and columns are where this edition has them.

    Code: pipeline/src/envdash/transforms/energy/eia_aeo_lcoe.py · code sha256 6af1f54fab63241e… · inputs e371002d0282… 8c11a13bed5b…

  2. Checked inside the file: each total system cost equals the sum of its capital, fixed O&M, variable and transmission components; each total including tax credits equals the total plus the credits listed; the regional sheet's simple average with tax credits equals the components sheet's total including tax credits; every average lies within its regional minimum and maximum.

    Code: pipeline/src/envdash/transforms/energy/eia_aeo_lcoe.py · code sha256 6af1f54fab63241e… · inputs e371002d0282… 8c11a13bed5b…

  3. Published, for each plant type: the total system cost before tax credits and the total including tax credits (simple averages of the 25 supply regions, each with its regional minimum and maximum as the range), and the capacity-weighted average including tax credits (null where EIA marks it NB, not built). Values as stored in the workbook; nothing is computed across plant types.

    Code: pipeline/src/envdash/transforms/energy/eia_aeo_lcoe.py · code sha256 6af1f54fab63241e… · inputs e371002d0282… 8c11a13bed5b…

  4. Checked the averages including tax credits against the labels on page 8 of the report (publisher checks).

    Code: pipeline/src/envdash/transforms/energy/eia_aeo_lcoe.py · code sha256 6af1f54fab63241e… · inputs e371002d0282… 8c11a13bed5b…

What it covers

Geography
United States (25 electricity supply regions)
Basis
Levelised cost of electricity (levelised cost of storage for batteries) for plants entering service in 2031 in the AEO2026 Counterfactual Baseline case: capital, fixed and variable operation and maintenance including fuel, and transmission, over a 30-year cost recovery period at an after-tax weighted average cost of capital of 7.27%. Laws and regulations effective as of December 2025, including the One Big Beautiful Bill Act's changes to tax credits and the EPA's 2024 Section 111 rule (new gas combined-cycle plants without carbon capture limited to a 40% capacity factor). No carbon price. Projection; the cost to build and run a plant, not the value of its output to the grid.
Unit
US dollars (2025) per megawatt-hour (USD/MWh)